Country hub

DR Congo

Every Lobito-relevant project, actor, and dispatch with material exposure to DR Congo.

1 articles3 projects3 actors

Projects

Tracked in DR Congo

Prequalification

DRC rail rehabilitation (Tenke–Kolwezi–Dilolo)

Rehabilitation of the Congolese corridor segment, estimated at $400–410m, with an international tender announced for April 2026.

$405.0M
Operational

Kamoa-Kakula Copper Complex

The corridor's anchor freight origin near Kolwezi — first contracted rail customer with 120,000–240,000 t/yr reserved capacity.

Operational

Lobito Atlantic Railway concession

30-year concession operating and modernising the 1,300 km Lobito–Luau railway and the Lobito port mineral terminal.

$753.0M